StrandCheck my address

About Strand

One street in 2017, 41 towns now

Strand started when three engineers laid fibre down their own street in Bishopston. We still dig, fit and answer the phone ourselves.

Eight Strand engineers in navy work clothes talking in a depot yard beside two white vans in the early morning.

From one street

  1. 2017First street live in Bishopston, 340 homes.
  2. 2019Keynsham depot opens. 10 towns, our first 100 engineers.
  3. 20222,000 Mbps on every connection. Price promise written into contracts.
  4. 202641 towns and 186,400 homes. Clevedon and Nailsea next.

We dig our own streets

Every metre of the network is ours, laid by our own crews and planned street by street. That’s why we can promise a price: there’s no wholesale bill from someone else that can go up.

Two engineers laying an orange duct in a narrow trench along a pavement, terraced houses behind.

Who runs it

  • Neha Kapoor, Head of customer care

    Neha Kapoor

    Head of customer care

    Runs the team that answers the phone till 8pm. Nobody reads from a script.

  • Dan Whitlock, Lead engineer, Keynsham depot

    Dan Whitlock

    Lead engineer, Keynsham depot

    Fitted his first Strand box in 2017, on his own street. Plans every install round in Bath and North Somerset.

  • Ama Mensah, Network planning

    Ama Mensah

    Network planning

    Decides which street the diggers reach next, and writes to every house before they do.